survey control point vs benchmarksurvey control point vs benchmark

survey control point vs benchmark survey control point vs benchmark

A control point may have one or more of these values attached to it. such as the US Survey Foot or international meter. 0000011476 00000 n It is a relatively permanent point of reference whose elevation for some assumed datum is known. 0000004492 00000 n This method is ideal when transferring control over long distances to remote projects where there isnt any existing, or sufficient control. A concrete pillar either set in a steel pillar driven into the ground or a concrete pillar cast in place. 0000006746 00000 n This is a check to ensure that existing, known or network control has not been disturb ed and that the published values are, indeed correct. Construction Phase Services The Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed issued by Owner after approval of the Guaranteed Maximum Price Proposal and shall continue until Final Completion of all Work. Go to Page . Three inches in length with a 1" (25mm) convex top, it features a conical recessed center camber for pinpoint . If positions are measured relative to other positions, what is the first position measured relative to? SHORT TERM EXTENSION In the event a replacement Contract has not been issued, any Contract let and awarded hereunder by the State, may be extended unilaterally by the State for an additional period of up to 3 months upon notice to the Contractor with the same terms and conditions as the original Contract including, but not limited to, prices and delivery requirements. Except where otherwise noted, content on this site is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. It opens window to search vertical and horizontal survey control point information. Are there going to be any obstructions placed around the control mark (like fencing)? Join your peers on the Internet's largest technical engineering professional community.It's easy to join and it's free. They define and locate natural and manmade features like woodlands, waterways, important buildings, and bridges. Thanks. The amount, if any, by which the total costs set forth in the Construction Budget exceed the amount of the Tenant Improvement Allowance is referred to herein as the Over Allowance Amount. Geographic positions are specified relative to a fixed reference. Such point ought to be to a permanent object to ensure next day Its easily identified. 0000004261 00000 n 0000009144 00000 n They show the distance between any two places, and they also show the direction fr, "Maps for America" was originally published in 1979 as a Centennial Volume commemorating the Geological Survey's hundred years of service (1879 - 1979) in the earth sciences. For instance, she may place marks at the northeast and southwest corners of a piece of land to . Also, read: What Is Raft Foundation | Type of Footing | Detail of Raft Footing. For other uses, see, Last edited on 21 November 2022, at 23:41, Geospatial Information Authority of Japan, Department of Rural Development and Land Reform, point from which distances from London are calculated, "Long hidden 'Mini Monument' unveiled for first time, will be covered up again", History of the Canadian Geodetic Survey Division, Detailed description of the different types of UK benchmark, US NGS Benchmarks overlaid on a Google Map, Benchmarks in the UK, mostly Gloucestershire, plus Gibraltar & Barcelona, https://en.wikipedia.org/w/index.php?title=Benchmark_(surveying)&oldid=1123119927, Netherlands Partnership Geodetic Infrastructure (NSGI), Benchmark A in Washington, D.C. is miniature replica of the, This page was last edited on 21 November 2022, at 23:41. control, horizontal-1 Physical stations which have known horizontal coordinates (longitude and latitude), and which can be used to provide horizontal coordinates for other surveys. Can I still get the older topographic maps? Interference from dense foliage and other structures can limit function and communication. The squares are clusters of marks in that area. A temporary benchmark in surveying is a control point that is set by a surveyor to base other points off of. On4o6*rjo4(JKN^b3~S@_~wpaa6E;]6`&x.e`[M]W\I6ftJJ$`Y7Ho;]w&FF'?8(C!aIBC=,RzqF 1"UN{Y+i]O'%LI KF)#Kj/M x(X+1%d TSD9a)HB"QC@c!q M47Y&OyLZTl'zaT. Projects such as the following require accurate and traceable measurements. The term benchmark, bench mark, or survey benchmark originates from the chiseled horizontal marks that surveyors made in stone structures, . %PDF-1.3 % 0000012384 00000 n Fri., 9:00 a.m. 4:30 p.m., EST ). 23 Jun 06 03:08. A benchmark is typically for the builders. 0000013440 00000 n Download our historical topographic maps and our more current US Topo maps (published 2009-present) free of charge using TopoView (GeoPDF, GeoTIFF, JPEG, and KMZ formats) or using the USGS Stores Map Locator (GeoPDF format). Monument maintenance is performed on a monthly basis. Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a parts function at the center of their design considerations. 0000014821 00000 n On projects that don't require survey control, localized control may . CONTROL POINT or CONNECT POINT or CONCRETE PAD: CPED: CABLE PEDESTAL: CR: CURB RETURN: CRM: . 2. Time period of content date. Our infrastructure marking products can be found in all 50 states and over 100 countries around the world. Such work will be identified by the Authorized User within the RFQ. 3. The intersection of the checkerboard (or triangles as below) is what the surveyed point will be, and when the aerial surveyor is identifying the marks to register from their photos, they will be able to easily click the pixels that match up with the middle of the checkerboard. The Secondary points are still survey control points that can be used to position Detail points but they are ones that are allowed to be moved by an excavation or may be placed on structure that may move over time. This courseware module is offered as part of the Repository of Open and Affordable Materials at Penn State. From Pt 010, set your BS to Pt 200 and then turn to and do a check measure to Pt 102. If a public officer sets the monument, it shall be marked by an appropriate official designation. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. 0000011800 00000 n 0000008070 00000 n Guard Stake-A stake driven near a point usually sloped with the top of the guard stake over the point. Thank you for helping keep Eng-Tips Forums free from inappropriate posts.The Eng-Tips staff will check this out and take appropriate action. Click Wage Schedule located underneath the main header of this page. 0000012811 00000 n *Eng-Tips's functionality depends on members receiving e-mail. The position and height of each benchmark is shown on large-scale maps. 0000007817 00000 n 0000009079 00000 n A surveyor places survey markers to label major points on the land's surface. The control system is segmented into six control networks which provide control marks for specific purposes. All these benchmarks are indicated on a brass plate fixed to a concrete pedestal with well-protected wall. 5. It is important that the primary control is accurate as all secondary survey control stations will be established from it, and if GNSS receivers are being used by the surveyor or the civil contractors machinery on site, it is likely that their base will be setup on one of these primary surveying control marks. Construction Contract; Cost Budget Prior to execution of a construction contract, Tenant shall submit a copy of the proposed contract with the Contractor for the construction of the Tenant Improvements, including the general conditions with Contractor (the Contract) to Landlord for its approval, which approval shall not be unreasonably withheld, conditioned or delayed. 0000003229 00000 n International Sales We are called Berntsen International for a reason. The Survey Section of the Public Works Department establishes and maintains horizontal and vertical survey control throughout the City for most public and private projects. The surveying control is also important because it links all stages of a project together: All three phases in a project listed above are spatially related to each other because the same survey control (or same site datum) was used throughout the project. No. For General Purpose Control Surveys, the jurisdictional agency responsible for maintaining the survey control mark network should make available, where possible, the relevant survey control information to facilitate . Land measurement for planning and development purposes, global guidance note, 1st edition. Additional filters are available in search. You might wonder how a control network gets started. Contractor shall not incur any Subcontractor costs for construction of the Project prior to issuance by Owner of written authorization to commence such Work. 0000012527 00000 n International Land Measurement Standard. Please let us know here why this post is inappropriate. A benchmark is a monument that is part of a leveling network and is a point of precisely measured elevation. Share sensitive information only on official, secure websites. For further assistance, contact the National Geodetic Survey at 301-713-3242 or ngs.infocenter@noaa.gov . Below I list out what I consider to be primary and secondary control points. The design from the engineers is then setout on site using the same control points/site datum that was initial established during the site survey. Not all control points are as stable and long lasting as others. The control points, which are in the survey CAD, have to be in the same coordinate system as the proposed design file. Registration on or use of this site constitutes acceptance of our Privacy Policy. The Unit uses specific products to publish the co-ordinates and other attributes of ASCMs. In the U.S., the National Geodetic Survey (NGS) maintains a National Spatial Reference System (NSRS) that consists of approximately 300,000 horizontal and 600,000 vertical control stations (Doyle,1994). Information provided should not be considered legal advice and all buyers, agents and title companies should . Also, read:What Is the Penetration Test | What Is the SPT Test | Procedure | Efficiency | Advantages andDisadvantages. 0000005143 00000 n 0000005286 00000 n Post-Processed Differential Correction, Chapter 6: National Spatial Data Infrastructure I, Chapter 7: National Spatial Data Infrastructure II, Repository of Open and Affordable Materials, Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License, Department of Energy and Mineral Engineering, Department of Materials Science and Engineering, Department of Meteorology and Atmospheric Science, Earth and Environmental Systems Institute, Earth and Mineral SciencesEnergy Institute, iMPS in Renewable Energy and Sustainability Policy Program Office, BA in Energy and Sustainability Policy Program Office, 2217 Earth and Engineering Sciences Building, University Park, Pennsylvania 16802, Global-regional dynamics; deformation measurements, NSRS secondary networks; high-precision engineering surveys, NSRS terrestrial; dependent control surveys for mapping, land information, property, and engineering requirements. Feedback and data questions should be sent to: monument@wsdot.wa.gov, For information on a specific Monument or area check the Contact page, NGS Data Sheet Internal benchmarking compares metrics (performance benchmarking) and/or practices (practice benchmarking) from different units, product lines, departments, programs, geographies, etc., within the organization. Frequently, bronze or aluminum disks are set in stone or concrete, or on rods driven deeply into the earth to provide a stable elevation point. 0000010217 00000 n Attribute values of each point may contain accuracy data, physical descriptions on the monuments, Each individual Point has a location relative to all other points in the database as referenced to a coordinate grid. The site editor may also be contacted with questions or comments about this Open Educational Resource. A GTS Benchmark full name Great Trigonometrical Survey. The total context against which all products are measured and compared is referred to as the benchmark. SWFWMD Survey Monument Benchmark Interactive Map Note: To connect to the mobile application with your mobile device: Load the ESRI ArcGIS Online application then search the Gallery for SWFWMD Survey; select the "Survey Base Map" to view the map. Each individual Point has a location relative t This method is when you have your GNSS base station set upa over a single known point, and it sends out corrections in real-time to the rover GNSS receiver when surveying new points. Construction Administration Phase Upon Districts acceptance of Architects work in the previous Phase and assuming District has not delayed or terminated the Agreement, the Architect shall perform Construction Administration Phase services for the District as follows: PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply: Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Approximately 1,120 of these survey control markers make up the provincial High Precision Network (HPN). Azimuth Mark: A Type 'A' or Type 'B' project control monument set at the end points of the project for use as a 'backsight' point. To view information about a control mark click on the marker on the map. Secure .gov websites use HTTPS Before reliable timepieces were available, astronomers were able to determine longitude only by careful observation of recurring celestial events, such as eclipses of the moons of Jupiter. . title: Survey Control for Salem, Oregon: description: This map represents City of Salem, Oregon, Survey Benchmarks. 24. Land surveyors measure horizontal positions in geographic or plane coordinate systems relative to previously surveyed positions called control points. Order paper All topographic maps produced by the U.S. Geological Survey (USGS) are in the public domain and are not copyrighted except for the following three cases that apply only to US Topo maps (produced 2009-present): Most maps in the period 2010-2016 contain commercially licensed road data (see note below). This process includes research of the public records to identify survey monuments in the vicinity of the project area that are identified on recorded maps. The Mark Center button places an X at the very center of the current map extent and performs a radius search base on the radius distance specified. We continue to publish coordinates for some 25,000 horizontal control points in NAD83(Original), and close to 81,000 vertical benchmarks in CGVD28 and CGVD2013 (see the section . Department of Rural Development and Land Reform, What Is the Penetration Test | What Is the SPT Test | Procedure | Efficiency | Advantages andDisadvantages, What Is Raft Foundation | Type of Footing | Detail of Raft Footing, First Angle Projection & Third Angle Projection Symbol (Orthographic Projection), Introduction of Gantry Girder | Load on Gantry Gutter | Types of Load on Gantry Gutter, What Is Dry Pack Mortar | Advantages of Dry Pack Mortar | Disadvantages of Dry Pack Mortar, What Is Unit Weight | What Is Density | What Is Unit Weight Material | Unit Weight Building Materials, What Is Pier Foundation | Types of Drilled Piers | Advantages and Disadvantages of Drilled Pier Foundations, What Is Diversion of Headworks (Rivers) | Types of Diversion Headworks | Component Parts of Diversion Headworks (Rivers), What Does Parapet Mean | Types of Parapet Wall | Uses of Parapet Wall, What Is a Flight of Stairs | Types of Stairs | How Many Stairs in a Flight | Some Facts About Stairwells, Cinder Block Vs Concrete Block | What Is Cinder Blocks | What Is Concrete Blocks, What Is Shoring In Construction | Type of Shoring, Floating Slab Vs Monolithic Slab | What Is Monolithic Slab | What Is Floating Slab, H-Beam vs I-Beam | What Is H-Beam | What Is I-Beam. A surveying control point is a mark or monument that has an established horizontal and vertical position by way of being surveyed and is identifiable on the ground. This document defines a U.S. Geological Survey (USGS) digital topographic map. The National Maps Elevation Point Query Service (EPQS) returns elevations that are interpolated from the 3DEP dynamic elevation service. 0000009854 00000 n The products come from the Multipurpose Alberta Survey Control Operations and Tasks (MASCOT) system. 0000007473 00000 n operational survey aspects i.e. By viewing the Mark List you can view and sort the attributes of the markers. Coordinate Conversion and Transformation Tool (NCAT), Horizontal Time-Dependent Positioning (HTDP), User-submitted Survey Projects (Bluebooking), Any mark with a Horizontal Source of [ADJUSTED or NO CHECK], Any mark with a Vertical Source of [ADJUSTED, ADJ UNCH, POSTED, READJUST, N HEIGHT, RESET, COMPUTED, GPSCONLV, LEVELING, GPS OBS (with 2 decimal elevation and not VERTCON)], Any mark with a Vertical Source of [H LEVEL, VERT ANG, U HEIGHT, VERTCON, GPS OBS (with an elevation less than 2 decimals)], Fits criteria for both GPS Site and Vertical Control, Fits criteria for both GPS Site and Approximate Height, Fits criteria for both Classical Horizontal and Vertical Control, Classic Horizontal and Approximate Height, Fits criteria for both Classical Horizontal and Approximate Height, Use the Go To Location on the menu to the left to zoom into the region and plot marks, Right click on the map in your area of interest and select 'Place X', You can change the radius used to plot marks under the Map Layers, Click on the Map Layers section on the menu to the left, Select all of the types of marks to plot on the map, To view the Mark List there must be marks plotted on the map, Click on the View List button at the top of the menu to the left, You can sort the mark list by any attribute when clicking on the headers of the table, By clicking on the PIDs listed you can view the Datasheet. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. Survey control can be established using GNSS receivers. Coordinates associated with horizontal control points are referenced to NAD 83; elevations are relative to NAVD 88. Close this window and log in. 0000011630 00000 n In the same survey, an even larger . 0000078413 00000 n They are all in geographic coordinates (latitude/longitude). 0000011566 00000 n A .gov website belongs to an official government organization in the United States. Insurveying, a bench mark (two words) is a post or other permanent mark established at a known elevation that is used as the basis for measuring the elevation of other topographical points. trailer << /Size 663 /Info 518 0 R /Root 541 0 R /Prev 468570 /ID[<7f274bab57f2d107a1be5151499d67c3><7f274bab57f2d107a1be5151499d67c3>] >> startxref 0 %%EOF 541 0 obj << /Type /Catalog /Pages 517 0 R /OpenAction 542 0 R /Names 544 0 R /StructTreeRoot 337 0 R /AcroForm 543 0 R /SpiderInfo 529 0 R /Outlines 546 0 R /PageMode /UseOutlines >> endobj 542 0 obj << /S /GoTo /D [ 545 0 R /XYZ -32768 -32768 1 ] >> endobj 543 0 obj << /Fields [ ] /DR 333 0 R /DA (/Helv 0 Tf 0 g ) >> endobj 544 0 obj << /IDS 527 0 R /URLS 528 0 R /Dests 475 0 R >> endobj 661 0 obj << /S 617 /T 962 /O 1042 /V 1058 /E 1080 /C 1096 /Filter /FlateDecode /Length 662 0 R >> stream __CONFIG_colors_palette__{"active_palette":0,"config":{"colors":{"f3080":{"name":"Main Accent","parent":-1},"f2bba":{"name":"Main Light 10","parent":"f3080"},"trewq":{"name":"Main Light 30","parent":"f3080"},"poiuy":{"name":"Main Light 80","parent":"f3080"},"f83d7":{"name":"Main Light 80","parent":"f3080"},"frty6":{"name":"Main Light 45","parent":"f3080"},"flktr":{"name":"Main Light 80","parent":"f3080"}},"gradients":[]},"palettes":[{"name":"Default","value":{"colors":{"f3080":{"val":"rgb(23, 23, 22)"},"f2bba":{"val":"rgba(23, 23, 22, 0.5)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"trewq":{"val":"rgba(23, 23, 22, 0.7)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"poiuy":{"val":"rgba(23, 23, 22, 0.35)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"f83d7":{"val":"rgba(23, 23, 22, 0.4)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"frty6":{"val":"rgba(23, 23, 22, 0.2)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}},"flktr":{"val":"rgba(23, 23, 22, 0.8)","hsl_parent_dependency":{"h":60,"l":0.09,"s":0.02}}},"gradients":[]},"original":{"colors":{"f3080":{"val":"rgb(23, 23, 22)","hsl":{"h":60,"s":0.02,"l":0.09}},"f2bba":{"val":"rgba(23, 23, 22, 0.5)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.5}},"trewq":{"val":"rgba(23, 23, 22, 0.7)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.7}},"poiuy":{"val":"rgba(23, 23, 22, 0.35)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.35}},"f83d7":{"val":"rgba(23, 23, 22, 0.4)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.4}},"frty6":{"val":"rgba(23, 23, 22, 0.2)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.2}},"flktr":{"val":"rgba(23, 23, 22, 0.8)","hsl_parent_dependency":{"h":60,"s":0.02,"l":0.09,"a":0.8}}},"gradients":[]}}]}__CONFIG_colors_palette__. The methodology for establishing new survey control from the below example would be: This is a very basic example but it highlights the steps needed to establish new survey control from an existing network of control stations. 0000093463 00000 n The model that is being used will have many different features depending on what the client wants. In addition we research the local agency benchmark data base to identify local . Projection: 3DEP DEMS have different projections/coordinate systems depending on the product: 1/3-, 1-, and 2-arc-second (also the discontinued 1/9-arc-second) DEMs are not projected. A major duty of field personnel is the proper, accurate, and timely staking of control points on the project. 0000007286 00000 n 0000004345 00000 n New Zealand's survey control system comprises physical control marks and information about them to enable the coordinates of other points to be determined. Click on a point for information about it and to link to the recovery sheet. Survey markers, also called survey marks, survey monuments, or geodetic marks, are objects placed to mark key survey points on the Earth's surface. 0000011866 00000 n 0000015002 00000 n 0000012669 00000 n as represented in this database correspond to the physical or determined locations of Survey Control Monumentation. 0000012240 00000 n Property Manager shall be responsible for conducting meetings as deemed reasonably necessary by Property Manager, with the architect, contractor and consultants for all Construction Projects. A control survey is the process of establishing survey control points that can be used to provide surveying services on a land development or civil construction project. They give surveyors a point of reference because they use them as part of a set of survey observations. 2. 8 steps in the benchmarking process. 3 The geometric data relating to the horizontal coordinates of a control station. Although many are attached to triangulation pillars as above, Non-Pillar Flush Brackets were also frequently located in the faces of buildings.[1]. Classic static surveys are acceptable for baselines less than 10kms [Source: SP1] and if done properly can achieve horizontal accuracies of +/-15mm survey uncertainty (SU) and vertical accuracy of +/-20mm SU [SP1]. Control points are established, managed, maintained and replaced by surveyors and are created at the start of any land development or civil construction project. 0000005001 00000 n 0000011953 00000 n Survey Markers. 0000017199 00000 n but why would you need bench marks, why not only use control points if they give you both? In these cases, the elevation of a permanent structure such as a corner of the plinth of a building might be assumed to have an arbitrary reduced level, like 100.00 m or 500.00 m. All these benchmarks are quite useful in small projects. Share it with your friends! 0000010991 00000 n They are used in geodetic and land surveying.A benchmark is a type of survey marker that indicates elevation (vertical position).Horizontal position markers used for triangulation are also known as triangulation stations. The PDF file may be searched to obtain the Prevailing Wage Rate for a specific occupation. Made of super strong solid steel, "SURVEY MARK" is clearly imprinted on top of the nail making detection and identification easy to spot. 0000092993 00000 n In the event that an Over-Allowance Amount exists, then prior to the commencement of construction of the Tenant Improvements, Tenant shall supply Landlord with cash in an amount equal to the Over-Allowance Amount. PROCUREMENT INSTRUCTIONS Authorized Users should refer to the documents attached as Appendix G Processes and Forms Templates for specific instructions on the usage of this Contract. Learn more about each tool below to understand which one suits your needs. By joining you are opting in to receive e-mail. 1. In some places, GTS benchmarks are available within a kilometer distance and can be easily moved to the survey area by fly leveling using an automatic Level instrument along with a graduated leveling staff. Any monument set by a land surveyor to mark or reference a point on a property or land line shall be permanently marked or tagged with the certificate number of the land surveyor setting it. Sebelum dilakukan pengukuran, dilakukan pemasangan patok sebagai sarana penyimpan informasi koordinat hasil pengukuran. The Steel Nail Marker is designed to be driven into blacktop with ease and stability. There are two primary types of control networks in surveying, (1) site control networks and (2) geodetic control networks. Instructors and contributors: Jim Sloan, Senior Lecturer, John A. Dutton e-Education Institute; Ryan Baxter, Senior Research Assistant, John A. Dutton e-Education Institute, Beth King, Senior Lecturer, John A. Dutton e-Education Institute and Assistant Program Manager for Online Geospatial Education, and Adrienne Goldsberry, Senior Lecturer, John A. Dutton e-Education Institute; College of Earth and Mineral Sciences, The Pennsylvania State University. These might be points located on the boundary of the area to be mapped, points of maximum or minimum elevation, significant features, etc.. At least 3 points should be clearly visible from each point. The state plane coordinate of this station has the same numerical value as the City Grid bearing the same station number. The Location Surveying Office for each District is responsible for providing certified Horizontal and Vertical Control in support of design, construction, and maintenance of the FDOT transportation network and facilities for the counties within their District. 0000008004 00000 n In surveying, a bench mark (two words) is a post or otherpermanent mark established at a known elevation that is used as the basis for measuring the elevation of other topographical points. 0000010460 00000 n A "benchmark" isn't just a slang term for a starting point. 0000093389 00000 n 0000010870 00000 n Also, read: What Is Soundness of Cement Test. 0000093125 00000 n The Contractor shall include in his plan the names and resums of the Project Superintendent, Project Manager and the person in charge of Safety.

Are Poppy Harlow And Jim Sciutto Married, Articles S

No Comments

survey control point vs benchmark

Post A Comment